GLIMTEN / BOARD FINANCES
Evidence reviewed
14 October 2026
Brf Råcksta Glimten · 769627-4161

Understand the numbers.
Plan the next decision.

The financial plan, what has changed, and practical tools for monthly avgifter, loans and parking. All amounts are in SEK. Designed for the board to read together.

22 homes2,998 m² BOAPlanning model · current accounts incompleteWorks offline · no data sent
01

The documented starting point

The registered ekonomisk plan is a project forecast from October 2025, not an adopted 2027 budget. The September 2026 register supports the fee levels below. Occupancy is board-reported at 10 of 24 spaces as at 14 October 2026. The supplied folder is the latest available financial evidence. D0085, p.1 D0936

Annual base housing fees
1,618,719
≈ 6,132 per home / month on average.
Excludes water, broadband and parking.
Original association debt
33.23m
11,085 per m² BOA.
Current balance after repayments unverified.
Contracted weighted interest
3.2433%
Usually rounded to 3.24%.
Plan assumed 3.50%.
Parking occupancy
10 / 24
41.7% rented. Plan assumed 100%.
24 includes two accessible HKP spaces.

One full year: plan versus the information we have now

“Updated” changes only parking occupancy and the three contracted rates. All other amounts retain the plan assumptions. This is an annualised comparison, not actual 2026 results. Calculations use unrounded rates and original principal; displayed amounts round to whole SEK.

Income, cost or cash allocationRegistered plan / yearUpdated model / yearEvidence / meaning
Base housing fees / årsavgifter1,618,7191,618,719Fees exclude utilities. D0085, p.9
Water recovered from households123,860123,860Assumed matched to cost.
Broadband recovered from households66,00066,000250 per home / month.
Parking income retained259,200108,00024 → 10 spaces × 900 × 12; current-model no-VAT basis.
Total recurring income2,067,7791,916,579Full-year run rate, not cash collected.
Operating costs excluding utilities392,200392,200Plan estimates retained. D0085, p.8
Water + broadband costs189,860189,860No surplus assumed on utilities.
Property tax / charge00Plan assumes new-build exemption.
Loan interest1,163,1491,077,851Actual contracted rates × original balances. D1316, p.11
Cash from operations322,570256,668Before amortisation and maintenance.
Amortisation / amortering232,630232,630Repayment of debt, not an accounting expense.
Cash left after amortisation89,94024,038Available for maintenance and buffers.
Original maintenance saving target89,94089,940Funding comparison; not a bank outflow.
Margin after original target0-65,902Unchanged fees and other costs.
Margin after 122,930 maintenance average-32,990-98,892Separate maintenance-plan benchmark.
Three different numbers: income less running costs and interest is cash from operations. Subtracting amortering leaves cash available for maintenance and buffers. Subtracting a chosen maintenance saving target shows whether that target is funded. A transfer to yttre underhållsfond is an accounting allocation within equity; it does not itself move money out of the bank or guarantee cash exists.

What the operating budget contains

Cost, including non-recoverable VATSEK / year
Waste / avfall73,000
Gardening & snow101,000
Financial management36,000
Audit20,000
Property insurance52,000
Board remuneration14,000
Operating contingency16,200
Samfällighet80,000
Total, excluding utilities392,200

The SEK 16,200 operating contingency is already included. Water (123,860) and broadband (66,000) bring total running costs to 582,060. Private household electricity/heating and home insurance are outside this association budget. D0085, p.8

Funding, fees and accounting

Planned acquisition / construction cost157,377,830
Member capital: insatser + upplåtelseavgifter124,145,000
Borrowed funding33,232,830
Debt / planned acquisition cost21.1%
Base housing fees / BOA / year540
Water estimate / home / month469.17
Broadband / home / month250.00
Planned depreciation / year2,327,643
Planned accounting result / year−2,005,073

Capital contributions paid for the property; they are not recurring income or spare cash. The 21.1% ratio uses historical project cost, not a current market valuation. The plan estimates a latent tax liability of 11,034,565 on a future property disposal; it is not an annual operating bill. D0085, p.6 D0085, p.10

The three loans and the dates that matter

LoanOriginal principalRateRate term endsNotice date in contractAmortisation
1 · shorter term11,077,6102.99%23 June 20279 June 2027None shown
2 · middle term11,077,6103.28%20 June 20296 June 2029None shown
3 · longer term11,077,6103.46%18 June 20314 June 203158,158 / quarter

Contract terms: D0939, p.1 D0939, p.3 D0939, p.2. 4 × 58,158 = 232,632/year; the presentation and plan use 232,630. The model keeps 232,630 for reconciliation, a SEK 2 difference. Confirm bank balances, payment dates and renewal procedures; do not send a termination notice just to ask for a new rate. The contracts link termination to full repayment. First review: March 2027.

Why the saving is 85,298 rather than 86,406: (2.99 + 3.28 + 3.46) ÷ 3 = 3.243333…%. Multiplying the rounded 3.24% by all original debt understates annual interest by about 1,108. The unrounded contracted rates reproduce the handover’s 1,077,851 annual interest estimate. D1316, p.11
The folder’s actual figures: useful, but not a reliable operating baseline
SnapshotWhat it saysHow to interpret it
August 2026 income reportBase fees 120,200; parking 10,248; water 9,077; broadband 4,839; total income 146,140.Zero operating costs recorded in this report. Transition and staged occupancy make ×12 misleading. D0312
31 August 2026 balanceNabo 433,429; Borgo 139,000; temporary transfer −16,852; total “cash and bank” 555,577.Includes a temporary account; property, equity and bank loans are absent. This is not verified free cash. Prepaid fees of 146,774 are also recorded. D0311
Developer settlement no. 2191,307 receivable after 232,963 less 41,656.Need receipt / agreed settlement evidence. Not recurring income. D0941, p.1
Developer settlement no. 1452,911 payable, invoice due 30 September 2026.Need payment / agreed set-off evidence. The arithmetic net of the two is 261,604 payable, not proof of an outstanding balance today. D0942
2025 annual accountsAbout 5.98m loss, including a 6m project write-down.Construction-period accounting; unsuitable for estimating annual operating spending. D0360
02

What needs the board’s attention

The fee decision
Lower interest helps.
It does not fully cover the empty spaces.

Parking falls by 151,200/year. Interest falls by 85,298/year. Together, cash available for maintenance falls by 65,902/year, from 89,940 to about 24,038.

With unchanged costs and occupancy, base housing fees would need approximately +4.07% to restore the plan’s maintenance allowance, or +6.11% to fund the separate maintenance plan’s annual average.

Those are about 250 or 375 per home per month on average. Actual changes follow the existing fee shares; water, broadband and parking are separate.

Do not reduce fees on the interest saving alone. Prepare the 2027 budget now; a final decision needs reconciled costs, cash and a realistic parking plan. These thresholds are calculations, not an approved increase.

Could fees stay unchanged?

Yes, if verified savings or additional net parking income close the gap while preserving a suitable cash buffer. Keeping fees unchanged with only 10 rented spaces leaves very little recurring money for maintenance.

At unchanged fees and costsRestore 89,940Fund 122,930
All rentals retain 900/month net17 total spaces20 total spaces
10 internal at 900; additional external at 900 including VAT (720 net)+8 external+12 external
10 internal discounted to 700 net; external at 900 including VAT+11 external+15 external*

*15 external plus 10 internal exceeds 24 spaces. Figures assume full-year rent, current internal no-VAT treatment, no incremental costs and unchanged loan rates. HKP availability must be checked. Partial-year lets produce proportionately less.

The original long-term plan already assumes 2% annual increases in housing fees, other income and costs. A permanent fee freeze is not the plan’s baseline. D0085, p.13

Gaps to resolve before setting the budget

1

Reliable opening cash and complete costs

Obtain the reconciled opening balance, bank/client-account statements, full general ledger, unpaid invoices, accrued interest, prepaid fees and fee arrears. Reconcile both developer settlements. The partial August reports cannot answer whether an immediate cash shortfall exists. D0311 D0312 D0941 D0942

2

Maintenance saving is too thin

The plan allows 89,940; the separate 50-year plan averages 122,930, a difference of 32,990/year. Its prices have 0% indexation and exclude small annual jobs and interiors. Confirm responsibilities, quantities, current prices and planned cash use. Fund allocations, amortisation and bank savings serve different purposes. D0152, p.4 D0152, p.5 D0153, p.2

3

Parking demand, VAT and the two HKP spaces

Do not budget all 24 as guaranteed renters. There are 22 ordinary and two accessible spaces. Confirm eligibility, signage and lease terms. Discounts must generate enough additional retained rent to offset the reduction for existing tenants. External contracts and VAT administration may add costs. D1097 D0940, p.1 Parking evidence review.

4

Samfällighet and winter operations

80,000 for the samfällighet is an estimate; obtain the adopted levy and property shares. Snow/gardening has a 101,000 allowance but the handover says the board must arrange coverage. Clarify responsibility boundaries so costs are neither omitted nor duplicated. D0085, p.8 D1316, p.4 D1316, p.14

5

Contract prices are not complete annual actuals

Nabo’s base is 35,000 including VAT against 36,000 budgeted, before extras and 2027 indexation. Insurance shows 49,016 for 17 February 2026–31 January 2027; that is not a comparable 12-month renewal quote. Planima is 3,062.50 including VAT/year; ensure it is included somewhere. Check emergency call-outs, board social charges, Boappa and audit costs. D0940, p.1 D0937 D1316, p.20

6

Water and broadband may not be neutral

The model assumes matched recovery and cost. Water is billed as a schablon in the register, whereas the plan envisages measured consumption. Confirm reconciliation, leaks, standing charges and administration. A Telia settlement item of 17,244 for September–November annualises to 68,976, against 66,000 charged; this suggests a 2,976 potential gap, pending a full current invoice review. D0936 D0085, p.12 D0941, p.1

7

Waste, compliance and recurring care

The existing waste evidence suggests about 55,600/year versus 73,000 budgeted, but service expansion, bins and extras are unresolved. Do not bank that apparent saving. Include roof/fire care, radon completion and the 2028 guarantee inspection where the association bears costs. Waste evidence review; D0081 D1316, p.18.

8

Refinancing and longer-term tax

Only one-third of initial debt reprices in June 2027; test that loan first. The original forecast introduces property charges of 304,234 in year 16. Verify the final tax classification and value year: the end of the 15-year new-build exemption depends on that decision. D0085, p.13 D0939 Skatteverket.

Accounting loss ≠ the cash shortfall. The original plan intentionally forecasts a roughly 2m annual loss because depreciation is much higher than amortisation and planned saving. Depreciation is non-cash in the year recorded, but buildings still wear out. Use a maintenance and funding plan to assess sustainability; neither a book loss alone nor a positive bank balance settles the fee decision. The supplied plan and Nabo agreement already specify K3. D0085, p.7 D0085, p.10 D0940, p.1
03

Scenario lab

Change one assumption or combine several. The model covers a full 12 months at the chosen settings. A rate change here applies immediately for that entire year; use the dated refinancing tool below for 2027–2031.

Start with:

Known position: 10 internal spaces, no external spaces, contracted rates; all other costs still use the economic plan.

Housing fees & maintenance

Percentage changes apply to base årsavgifter only.

Set a target
Parking prices & occupancy
Loan interest
Operating costs, utilities & other income

All values are annual cash costs including non-recoverable VAT. Change the line items and/or apply the uplift to the eight operating items. The uplift does not affect utilities, extra costs or property tax.

One-off cash use & accounting
Annual gap / surplus after target

What moves the result?

Change versus the original plan’s zero margin. Target and amortisation are funding allocations; this bridge is not an income statement.

Keep scenarios for the board meeting

Comparison scenarios stay in this tab until it is closed. Download JSON to preserve settings or share them.

Current scenario assumptions (also included when printing)
04

Parking: price is only half the decision

The following tools follow the scenario settings above. All revenue figures are retained income after output VAT, before parking costs unless stated.

The chosen parking mix

InternalExternalVacant / excluded

Illustrative capacity diagram, not an allocation map. Slots 23–24 represent the two HKP only for capacity planning.

What does a discount have to earn back?

SEK 900 can mean two different things. At 25% VAT, 900 including VAT leaves 720 for the association. A net rent of 900 means the tenant pays 1,125. Skatteverket normally treats parking as taxable, with changed assessment for resident parking applied on its initiative from 1 April 2027. External letting needs its own current treatment confirmed. Official guidance.

How many external spaces would close the gap?

Holds current internal occupancy and all other scenario settings constant. Uses the external price/VAT basis above. Results include the annual parking-cost allowance already entered.

Before lowering the internal price: record actual demand, decide a consistent internal/external policy, confirm accessible-space rules, check notice periods and ask Nabo for the cost of new agreements and VAT administration. Demand at a lower price is an assumption until tenants commit. Empty spaces cost revenue now, but an external lease also affects future resident availability.

Occupancy × interest: where does the budget balance?

Each cell is annual surplus/gap after the selected maintenance target. This isolated sensitivity assumes every rented space pays the chosen internal price with its selected VAT basis, and the displayed rate applies to all debt for a full year. Other scenario costs and fees stay unchanged.

05

What would each home pay?

Monthly estimates using the documented annual fee rows. The “scenario base” column follows the annual fee baseline and percentage change in the lab. This is not a billing instruction. D0085, p.11 D0085, p.12 D0936

1% on base fees
16,187
More income / year at the documented baseline.
≈ 61 per home / month on average.
+1 percentage point of interest
332,328
Extra / year if applied to all original debt.
20.53% of base housing fees.
+1 point on loan 1 only
110,776
Extra / full year on original loan 1.
6.84% of base fees; about half in 2027.
HomeBOA m²Documented base / monthScenario base / monthChange / monthScenario incl. water & broadband*
1-10011416344.25Enable JavaScript for scenario values
1-10021366119.25Enable JavaScript for scenario values
1-10031416344.25Enable JavaScript for scenario values
1-10041366119.25Enable JavaScript for scenario values
1-10051416344.25Enable JavaScript for scenario values
1-10061366119.25Enable JavaScript for scenario values
1-10071416344.25Enable JavaScript for scenario values
1-10081366119.25Enable JavaScript for scenario values
1-10091416344.25Enable JavaScript for scenario values
1-10101366119.25Enable JavaScript for scenario values
2-10011416344.25Enable JavaScript for scenario values
2-10021366119.25Enable JavaScript for scenario values
2-10031416344.25Enable JavaScript for scenario values
2-10041366119.25Enable JavaScript for scenario values
2-10051416344.25Enable JavaScript for scenario values
2-10061366119.25Enable JavaScript for scenario values
2-10071315894.25Enable JavaScript for scenario values
2-10081346029.25Enable JavaScript for scenario values
2-10091366119.25Enable JavaScript for scenario values
2-10101416344.25Enable JavaScript for scenario values
2-10111205399.33Enable JavaScript for scenario values
2-10121205399.33Enable JavaScript for scenario values

*Excludes parking, private energy/heating and home insurance. Water/broadband use the scenario’s annual recovered income ÷ 22 ÷ 12; real water billing can differ by consumption. Annual fee rows sum to 1,618,724 due to rounding, SEK 5 more than the plan’s 1,618,719 headline. The model uses the headline for association totals and scales individual rows proportionally. Monthly bills may use whole-SEK rounding.

First-year effect

The statutes give the board responsibility for setting fees and preparing a budget for maintenance funding. Preserve the fee distribution rules: the model applies a uniform percentage to existing base fees, not an equal SEK increase per home. Confirm decision wording, effective date and Nabo’s billing lead time before communicating a change. D0134, p.2 D0134, p.11
06

Look beyond the next invoice

2027–2031: staggered refinancing

Uses your scenario’s principals as illustrative 1 January 2027 opening balances. Replace the original amounts above with bank-confirmed balances for a proper budget. Chosen lab rates apply until each documented reset date; the refinancing rate below then applies for the rest of this horizon. Annual growth starts in 2028, so 2027 is the lab’s starting budget, not an automatically inflation-adjusted 2026 budget.

This is a sensitivity projection, not a cash balance forecast. It holds occupancy and the selected VAT treatment constant for each entire year; model the 2027 VAT transition separately with Nabo, especially billing periods crossing 1 April. One-off cash use is excluded. Interest uses opening annual balances and calendar-day weighting at resets, not the bank’s 360/360 accrual method. Repayments reduce loan 3 at year end, conservatively overstating interest slightly. A +1 point move affects only the loan that resets.

Liquidity: how much room is there?

Optional: enter a reconciled cash figure after excluding money already committed to unpaid bills, prepaid obligations and settlements. No cash balance is assumed from the incomplete August report.

The buffer is a board-selected planning assumption, not a legal minimum. Quarterly interest and repayments, seasonality and invoice dates matter. The tool spreads costs evenly and cannot establish the lowest bank balance within a year.

Maintenance: large bills arrive unevenly

The supplied 2026–2075 plan totals 6,146,500 in unindexed prices. It includes facade work of 1,454,250 in 2041 and again later, plus roof and other works concentrated in 2056. D0153

89,940 × 50 = 4,497,000, a 1,649,500 shortfall to that total if contributions stay flat and earn no return. The average 122,930 is an arithmetic starting point; it does not establish that every scheduled bill is funded at the right date.

The schedule below reproduces the supplied amounts, including the 15-space repainting quantity that needs checking. It does not add excluded routine work, interior costs or unlisted replacements. Verify who maintains heat pumps and other house equipment under the statutes and grant terms.

50-year maintenance funding illustration

A separate reserve illustration, independent of the operating lab. It assumes the annual contributions entered here are actually available in cash. Quoted costs are treated as 2026-price amounts for this illustration; the plan’s true pricing basis needs updating. No investment return, borrowing or subsidy is assumed.

Annual maintenance cash schedule
07

Turn the model into a board budget

Before approving the 2027 fees

Checklist ticks are session-only. Print a completed copy with the selected scenario for the meeting record.

How to read the calculations

Net parking = Σ(spaces × monthly net rent × 12)
Interest = Σ(principal × rate ÷ 100)
Cash from operations = all income − running cash costs − interest
Cash after amortisation = cash from operations − amortisation
Funding margin = cash after amortisation − maintenance target
Required fee change = (fees needed ÷ baseline base fees − 1) × 100

Depreciation is excluded from cash calculations. Amortisation is excluded from the accounting result. The maintenance saving target is neither an operating expense nor an automatic bank outflow. The indicative accounting result excludes one-off items because their expense/capital treatment is unknown.

The “saving per m²” output is an operating cash proxy before amortisation and planned maintenance. It is not a certified BFN annual-report key figure. Amounts are nominal SEK unless labelled otherwise. No discounting or interest on deposits is assumed.

VAT guidance checked 14 October 2026. Nabo’s agreement marks VAT administration and IMD “No”; update scope as needed. The small-business 120,000 VAT threshold includes housing fees in the relevant turnover test, so looking only at 108,000 parking income would be misleading. Skatteverket; D0940, p.1.

Source index & evidence boundaries

PDF page numbers refer to the PDF file order, not printed page numbers. In this online edition, citations jump to the source index. The original documents are held in the board handover archive and are not published here. The HTML itself can be shared alone: data and tools still work, but local source links need the archive. No owner names, personal identity numbers or private mortgage records are embedded.

IDDocumentUse
D008501 Föreningen\1.10 Kostnadskalkyl och Ekonomisk plan\Registrerad EkonomiskPlan BRF Råcksta glimten.pdfRegistered 13 October 2025; PDF pp.6–14 funding, costs, fees and forecast.
D093603 Ekonomisk förvaltning\3.02 Lägenhetsförteckning\Lägenhetsföreckning Brf Råcksta Glimten 2026-09-23.xlsx23 September 2026 fee / parking register. Personal rows are not reproduced.
D1316Överlämningsmöte Råcksta Glimten projekt, ekonomi.pdf8 October 2026 handover; loans p.11, parking p.12, operations pp.14–20.
D093903 Ekonomisk förvaltning\3.04 Avtal bank slutfinansiering\Villkorsbilagor.pdfLoan conditions dated 16 June 2026; rates, dates and repayment schedule.
D015201 Föreningen\1.19 Underhållsplan\Brf Råcksta Glimten underhållsplan.pdfFull 2026–2075 maintenance plan; scope and 0% indexation.
D015301 Föreningen\1.19 Underhållsplan\Underhållsplan BRF Råcksta glimten.pdfThree-page maintenance schedule; totals and action costs.
D013401 Föreningen\1.15 Stadgar\Stadgar BRF Råcksta Glimten (1).pdfStatutes; fees and maintenance funding provisions.
D031103 Ekonomisk förvaltning\3.01 Årsredovisningar och bokföring mm\Verifikationer\2026\678#202601#B#37_Realtidsbalansrapport-BrfRåckstaglimten2026-08-31.xlsx31 August 2026 partial balance report.
D031203 Ekonomisk förvaltning\3.01 Årsredovisningar och bokföring mm\Verifikationer\2026\678#202601#B#37_Realtidsresultatrapport-BrfRåckstaglimtenaug2026.xlsxAugust 2026 partial income report.
D094103 Ekonomisk förvaltning\3.06 Avräkningsdokument ekonomi brf\Avräkning Nr 2 Brf Råcksta Glimten.pdfSettlement no.2: 191,307 payable to the association.
D094203 Ekonomisk förvaltning\3.06 Avräkningsdokument ekonomi brf\Faktura Avräkning Brf Råcksta glimten.pdfSettlement no.1 and invoice: 452,911 payable to developer.
D036003 Ekonomisk förvaltning\3.01 Årsredovisningar och bokföring mm\Årsredovisningar\678 Brf Råcksta Glimten ÅR 2025 769627-4161 signed.pdfSigned 2025 annual accounts; development period.
D094003 Ekonomisk förvaltning\3.05 Avtal administrativ förvaltning\Avtal Ekonomisk Förvaltning - Brf Råcksta Glimten.pdfNabo management agreement: price, scope, extras and indexation.
D093703 Ekonomisk förvaltning\3.03 Fastighetsförsäkring med styrelseansvar\Försäkringsbrev - 25-38166865.pdfInsurance certificate / policy period and premium.
D109704 Teknisk förvaltning\4.10 Relationshandlingar\01. Mark, LA, VA\RH\RH, Parkeringsplan 01.pdf20 May 2026 parking as-built plan: 22 ordinary + 2 HKP.
D008101 Föreningen\1.08 Slutbesiktning, efterbesiktning bygg och protokoll entreprenad\Brf Råcksta Glimten slutsammanträdesprotokoll 260610.pdfFinal-inspection closing record; incomplete radon measurements.
D094504 Teknisk förvaltning\4.03 Avtal tele, TV, bredband, fiber\Telia Offert, Brf Råcksta glimten sign.pdfTelia agreement; original pricing and term. Confirm current invoices.

“Not located” means not located in this supplied archive. The review is not a complete invoice-by-invoice audit or a bank reconciliation. Historical quotations, project costs and incomplete ledger snapshots have not been presented as current annual actuals.